Full bathroom refits including tanking, tiling and fittings, built to handle the older plumbing runs common in North London's period properties.

Period properties across Hampstead and Highgate often have plumbing runs and water pressure that weren't designed around modern power showers or multiple bathrooms. We check the existing system's capacity before finalising a design, rather than fit a bathroom that never works properly once it's tiled in.
Proper tanking is non-negotiable on every bathroom we fit — it's the difference between a bathroom that lasts fifteen years and one with damp problems in the flat below within two.
A large portion of our bathroom work is en-suites added as part of a loft conversion or extension, which usually means routing new plumbing through spaces that weren't originally designed for it. We plan this at the structural design stage, not as an afterthought once the room's built.
Free, no-obligation assessment and a fixed written quote.
Materials, timeline and any permissions confirmed before we start.
One site manager, our own trades, start to finish.
Final walkthrough and snagging before we call it done.
Often yes, but it may need a pump or pressure upgrade first — we'll assess your existing system's capacity before finalising the design so the shower actually performs as expected.
A standard bathroom refit typically takes 1–2 weeks from strip-out to completion, longer if structural or major plumbing changes are involved.
Yes — this is one of our most common requests, and we design the plumbing routing into the loft conversion plan from the start rather than retrofit it afterward.