Rewires, consumer unit upgrades and certified electrical work, tested and signed off to current UK wiring regulations on every job.

Every electrical job we complete is tested and certified to current UK wiring regulations, with the paperwork provided at completion — not just left to you to chase up. This matters both for safety and because it's often required for insurance and when selling the property.
Many older properties across Hampstead and Highgate still have partial or full original wiring from decades ago, which typically needs addressing during any significant renovation rather than left in place behind new plaster.
If you're already renovating, it's almost always more cost-effective to rewire while walls are open than to retrofit later. We'll flag this at the quote stage if your property's existing wiring looks like it needs attention.
Free, no-obligation assessment and a fixed written quote.
Materials, timeline and any permissions confirmed before we start.
One site manager, our own trades, start to finish.
Final walkthrough and snagging before we call it done.
Signs include an old fuse box (not a modern consumer unit), frequent tripped circuits, or wiring that predates the 1980s. An EICR assessment gives a definitive answer — we can arrange this as a first step.
A full house rewire typically takes 1–2 weeks depending on property size, and is usually done alongside other renovation work since it involves opening up walls and floors.
Yes — every job is certified to current regulations, and we provide the relevant paperwork (EIC or EICR) at completion as standard, not as an extra.